It is for the factory realizes automation, intelligence and visualization. Realize "machine replacement" and reduce labor intensity; Optimize task allocation and improve operation efficiency; Visualization of task execution. AIT supply th...
AIT supply the test system solutions of camera modules、 VCSEL、Mini/Micro LED chips and projector modules.The test items include optical image SFR/Shading/Color/Particle testing、Electrical performance testing,etc
Automation Realize "machine replacement" and reduce labor intensity. The upper system is automatically controlled to reduce operation action, improve efficiency and reduce error rate. Easy to operate and learn, reduce the requirements for personnel quality and de experience。 | Intelligence Algorithm guidance, task allocation optimization, and improve work efficiency. AGV self-learning, dynamic path optimization, to achieve the minimum handling distance. Multiple AGV dispatching and traffic control. AGV automatic obstacle avoidance and intelligent charging | visualization Visualization of task execution, AGV operation status, AGV battery power, alarm information, statistics and AGV operation actions |
RCS Robot Scheduling Control System
World model establishment
Convert the physical environment of the plant into model data that can be recognized by the robot, and set up the map visually. Charging position, obstacle, high-speed area, deceleration area, queuing area, etc. Better adapt to different physical environments.
Multipath planning
On the basis of ensuring no congestion, provide a variety of processing mechanisms such as shortest path, avoidance control, and re planning control. Support the path planning of super large maps.
Multitasking
Through the task allocation algorithm, support the reasonable allocation of multiple tasks at the same time, consider multiple combinations, real-time status of the robot and other factors, assign tasks to the robot that completes the task most reasonably, and support the dynamic switching of tasks.
Traffic dynamic management
Dynamic driving direction management is carried out for various roadways, main roads and intersections of the world model to avoid road congestion.
standard interface
Network terminal architecture and anti downtime measures
Server downtime prevention measures:
When necessary, the system server can be one active and one standby, equipped with Rose hot standby software; In addition, in order to prevent unexpected power failure, it is recommended that the server room be equipped with UPS backup power supply to ensure the normal operation of the server.
Wireless network disconnection prevention measures:
Dual AC backup is recommended; In addition, to prevent accidental power failure of the network, UPS backup power supply can be considered.